National Repository of Grey Literature 3 records found  Search took 0.00 seconds. 
Construction Project for Implementation of Houses in Slavkov - Pod Zlatou horou
Kurková, Dita ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The subject of the diploma thesis is the solution of chosen parts of the construction technology project of the 1st phase of the construction „Komplex RD Slavkov, Pod Zlatou horou“. These are 4 semi-detached houses, overall 8 family houses. The work deals with technological regulations for the superstructure including roof, study of the realization of the construction technology project, design of the main construction machines and mechanisms and control and test plan. For the whole construction is elaborated time and financial plan in two variants, namely the gradual and current method of construction, and a detailed schedule for one semi-detached house. The technical report of the building site equipment is completed with the drawings, itemized budget of the building part of the house, noise study and specialization focused on the photovoltaic system, with an alternative solution to use solar collectors. The thesis also includes a case study of construction methods focused on the gradual and current method of construction.
Production hall in Brno - construction technology project
Šebelová, Zuzana ; Brandtner, Michal (referee) ; Venkrbec, Václav (advisor)
The subject of the diploma thesis is the construction and technological preparation and implementation of a production and storage hall in Brno. The content of the diploma thesis is a technical report for the construction and technological project, a study of the main technological stages, a project of the construction site equipment, traffic signs about the construction site equipment, as well as two technological regulations, the first for the assembly of the prefabricated reinforced concrete skeleton of the hall and the second for the implementation of the industrial floor with filling. This is followed by the design of the main construction mechanisms, the broader relationships of the transport routes, two inspection and testing plans for the aforementioned technological prescriptions, then a selected part of the health and safety plan, in particular the definition of the main risks and the design of safety measures for the technological processes, as well as a search of the Breeam and Leed sustainability certification of buildings, and the last chapter contains an alternative design for the industrial floor with a price comparison. In addition, a blind itemized budget for the rough top building, a material requirement plan for the selected prescription and other annexes have been prepared.
Construction Project for Implementation of Houses in Slavkov - Pod Zlatou horou
Kurková, Dita ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The subject of the diploma thesis is the solution of chosen parts of the construction technology project of the 1st phase of the construction „Komplex RD Slavkov, Pod Zlatou horou“. These are 4 semi-detached houses, overall 8 family houses. The work deals with technological regulations for the superstructure including roof, study of the realization of the construction technology project, design of the main construction machines and mechanisms and control and test plan. For the whole construction is elaborated time and financial plan in two variants, namely the gradual and current method of construction, and a detailed schedule for one semi-detached house. The technical report of the building site equipment is completed with the drawings, itemized budget of the building part of the house, noise study and specialization focused on the photovoltaic system, with an alternative solution to use solar collectors. The thesis also includes a case study of construction methods focused on the gradual and current method of construction.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.